Daily Archives: April 11, 2014

The conclusions drawn from the project in retrospect

The main conclusion derived from analyzing this project is that a game productions most instrumental asset is communication. For this project, the key to a working communication was a combination of the structure provided by the use of the MDA perspective on game development, which gave the group a common language and frame of reference when discussing every design based decision of the game. And the organizational focus that came from the use of the scrum model for planning and […]

/ Comments Off on The conclusions drawn from the project in retrospect
Program: Graphics

The conclusions drawn from the project in retrospect

The main conclusion derived from analyzing this project is that a game productions most instrumental asset is communication. For this project, the key to a working communication was a combination of the structure provided by the use of the MDA perspective on game development, which gave the group a common language and frame of reference when discussing every design based decision of the game. And the organizational focus that came from the use of the scrum model for planning and […]

/ Comments Off on The conclusions drawn from the project in retrospect
Program: Graphics